23rd July 2015

It’s always great to hear when one of the structures we have been involved in designing or installing proves to be a success. The work that was completed at Fulney Lock has recently been monitored using a sonar DIDSON camera. Plenty of fish have been observed passing upstream through what was previously a significant barrier to migration at the tidal limit. Some footage of an eel moving through the fish pass (kindly forwarded on to us by the EA) is shown below:

Comments are closed.